( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Project Client Period Scope
479 BASIC DESIGN OF 810 TONS/DAY 30% FUMING SULFURIC ACID MANUFACTURING FACILITY NAMHAE CHEM 2022.05~2023.08 E
478 LG CHEM ABS REBUILDING PROJECT LG CHEM 2022.05~2022.06 E
477 DESIGN SERVIED RELATED TO DISSOLVED REFINED SALT BUSINESS(PHASE 1) HANJU 2022.05~2022.09 E
476 VANADIUM ELECTROLYTE 480M3/YEAR PRODUCTION PLANT CONSTRUCTION LOTTE CHEM 2022.05~2023.06 E / P / C
475 LDPE EXTERNAL PIPING PIPE RACK EXTENSION DESIGN LG CHEM 2022.05~2022.12 E
474 FACTORY 1,2 RTO(12000NM3/HR, 23000NM3/HR) INSTALLATION PROJECT KUMHO P&B CHEM 2022.05~2023.01 E / P / C
473 VOC IMPROVEMENT DESIGN KUMHO POLY CHEM 2022.05~2022.08 E
472 LLDPE WEATHER PILOT OSBL FEED, TIC SERVICE LG CHEM 2022.04~2022.07 E
471 DAEGU JEODU DISTRICT VILLAGE SEWERAGE MAINTENANCE PROJECT GANGJIN-GUN, JEONNAM 2022.04~2024.04 P / C
470 PLANT IMPROVEMENT DESIGN KUMHO POLY CHEM 2022.04~2022.12 E
469 PLANT ANNUAL SHUT-DOWN PROJECT KUMHO MITSUI CHEM 2022.04~2022.11 E / P / C
468 DETAILED DESIGN FOR INTRODUCTION OF HIGH-CONCENTRATION PROCESS IN YEOSU PC PLANT LG CHEM 2022.03~2023.05 E
467 DAESAN O PILOT 2nd PROJECT BASIC DESIGN & TIC SERVICE LG CHEM 2022.03~2022.06 E
466 YEOSU NCC 2 PLANT RAW C5 EXPANSION DETAILED DESIGN LOTTE CHEM 2022.02~2022.12 E
465 YEOSU HDPE PLANT LINE-1 PROCESS DESIGN LG CHEM 2022.02~2022.04 E
464 5 LINE BASIC ENGINEERING DESIGN KUMHO POLY CHEM 2022.01~2022.02 E
463 GUNDONG BIJA DISTRICT VILLAGE SEWERAGE MAINTENANCE PROJECT GANGJIN-GUN, JEONNAM 2022.01~2024.01 P / C
462 LP PROCESS 60KTA NEW REVAMPING PROJECT KUMHO P&B CHEM 2022.01~2023.04 E / P / C
461 L-NC PROJECT RELATED EXTERNAL C3 LPG PIPING FEASIBILITY STUDY LOTTE CHEM 2022.01~2022.06 E
460 YEOSU INDUSTRIAL COMPLEX PUBLIC PIPE RACK PHASE 4 CONSTRUCTION(INCREASED STAGE) DETAILED DESIGN KICOX 2022.01~2022.07 E
459 500KG/DAY H2 PRODUCTION PROCESS DETAILED DESIGN WONIK MATERIALS 2021.12~2022.05 E
458 DETAILED DESIGN SERVICE RELATED TO THE EXTENSION OF 3 NMP TOWERS AT THE HUNGARY PLANT JAEWON INDUSTRIAL 2021.12~2022.05 E
457 PURGE GAS SUPPLY PIPE REVIEW SERVICE GS E&C 2021.12~2022.01 E
456 3 LINE DEBOTTLENECKING PROJECT RELATED WORK KUMHO POLY CHEM 2021.12~2022.08 E / P / C
455 ABS PLANT FLARE STACK NEW CONSTRUCTION DETAILED DESIGN LG CHEM 2021.12~2023.03 E
454 DESIGN OF A NEW PLANT TO PRODUCE 50000MT/Y OF PBAT(POLYBUTYLENE ADIPATE TEREPHTHALATE) S&I CORP. 2021.11~2023.12 E
453 4 LINE MVR(UC-403) NEW INSTALLATION PROJECT RELATED WORK KUMHO POLY CHEM 2021.11~2022.11 E / P / C
452 TRANSPARENT ABS DEBOTTLENECKING PROJECT LG CHEM 2021.11~2022.04 E
451 BASIC DESIGN SERVICE FOR PURIOGEN YEOSU PG-1 PLANT ESTABLISHMENT PURIOGEN 2021.11~2022.03 E
450 BDP & TIC SERVICE FOR THE ESTABLISHMENT OF AN 80,000TONS MMA(METHYL METHACRYLATE) PLANT IN ULSAN S&I CORP. 2021.11~2021.12 E