번호 | Project | Client | Period | Scope |
---|---|---|---|---|
448 | PILOT FACILITY DESIGN FOR RESEARCH & DEVELOPMENT OF POLY OLEFIN ELASTOMER | S&I CORP. | 2021.09~2022.09 | E |
447 | LG CHEM YEOSU PLANT SAP3 SMALL PARTICLE SIZE, FOAMING PROCESS IMPROVEMENT DETAIL DESIGN | S&I CORP. | 2021.09~2021.12 | E |
446 | BASIC DESIGN OF SEMICONDUCTOR SPECIAL GAS MASS PRODUCTION PLANT | JINSUNG ENG | 2021.09~2021.11 | E |
445 | OMA(OCTANOLE METHACRYLATE) 37.3TON/DAY DETAILED DESIGN & TIC SERVICE | S&I CORP. | 2021.08~2021.09 | E |
444 | ANNUAL OUTPUT OF 65,000MTPA LITHIUM BATTERY CATHODE MATERIAL(1-2) PROJECT | KOREA JAESAE NEUNGWON | 2021.08~2022.06 | E |
443 | SSBR 60,000T PROJECT | KUMHO PETRO CHEM | 2021.08~2022.12 | E / P / C |
442 | PVC SL-3 REVAMPING PROJECT | LG CHEM | 2021.08~2022.10 | P / C |
441 | ABS DP 220,000TONS REVAMPING PROJECT FEED DESIGN | LG CHEM | 2021.08~2021.12 | E |
440 | KPIC NEO-II & KBD PROJECT (PIPING/ELEC./INSTR./CIVIL) | GS E&C | 2021.07~2023.03 | E |
439 | TECHNICAL MANAGEMENT TEAM HANYANG BRIDGE FACILITY PRECISE SAFETY DIAGNOSIS | HANWHA SOLUTION | 2021.07~2021.10 | E |
438 | NO.2 MDI PLANT REVAMPING PROJECT(MDI)DESIGN, EQUIPMENT DELIVERY SERVICE | KUMHO MITSUI CHEM | 2021.06~2023.12 | E / P / C |
437 | NO.2 MDI PLANT PROJECT(FOX) DESIGN, EQUIPMENT DELIVERY SERVICE | KUMHO MITSUI CHEM | 2021.06~2023.12 | E / P / C |
436 | PMA 2000 TON/MONTH PRODUCTION PROCESS DESIGN | JAEWON INDUSTRIAL | 2021.05~2021.10 | E |
435 | GAS 2 TEAM 0.5TPD AMMONIA HYDROGENATION PROCESS DETAIL DESIGN | WONIK MATERIALS | 2021.04~2021.08 | E |
434 | FACTORY 1 RTO-2(38000NM3/HR 2EA) NEW INSTALLATION WORK | KUMHO POLY CHEM | 2021.04~2021.11 | E / P / C |
433 | 410KTA PLANT 3D DESIGN | KUMHO MITSUI CHEM | 2021.04~2021.12 | E |
432 | DETAILED DESIGN FOR PETROLEUM RESIN R-220 DUAL | HANWHA SOLUTION | 2021.04~2022.11 | E |
431 | POHANG PLANT HSPP-MPR-001-PILOT PACKAGE MANUFACTURING WORK | OCI | 2021.03~2021.06 | E / P / C |
430 | ONSAN PLANT NCC,DPG,RU UNIT SAFETY VALVE AND SHUT-OFF VALVE DESIGN SERVICE | KPIC | 2021.03~2021.12 | E |
429 | ACS ORGANIC LOADING PROCESS DEMOLITION AND RESTORATION WORK | LG CHEM | 2021.02~2021.05 | E / P / C |
428 | CIVIL DESIGN AND STEEL STRUCTURE REVIEW RELATED TO NCC PSV DUALIZATION | LG CHEM | 2021.02~2021.10 | E |
427 | EPC WORKS FOR PIPING AMONG LOTTE CHEMICAL 6BLOCK INFRA2 PROJECT | SGC E-TEC E&C | 2021.02~2022.04 | E / P / C |
426 | ISBL/OSBL STEAM SUPLLY PROJECT FOR LOTTE GS CHEMICAL | DAYONE ENERGY | 2021.02~2021.10 | E / P / C |
425 | ABS PLANT NEW FLARE STACK CAPACITY REVIEW & DESIGN | LG CHEM | 2021.01~2021.05 | E |
424 | CHANGWON HYDROGEN LIQUEFACTION PROJECT (BASIC AND DETAILED DESIGN) | DOOSAN HEAVY I&C | 2021.01~2023.02 | E |
423 | BUTANE BLENDING PROJECT | YTT | 2021.01~2021.03 | E / P / C |
422 | 2021 ABS CAPA UP BASIC DESIGN AND FEED | LOTTE CHEM | 2021.01~2021.04 | E |
421 | FACTORY 2 RTO(65000NM3/HR 2EA) NEW INSTALLATION PROJECT | KUMHO POLY CHEM | 2020.12~2021.09 | E / P / C |
420 | DETAILED DESIGN FOR PVC SL-3 REVAMPING PROJECT | LG CHEM | 2020.12~2022.11 | E |
419 | 3AA DEBOTTLENECKING BASIC DESIGN | LG CHEM | 2020.12~2022.11 | E |