번호 | Project | Client | Period | Scope |
---|---|---|---|---|
389 | NEW INSTALLATION OF D-GE/BDG EXPANSION REACTION FACILITY FOR DAESAN PLANT | LOTTE CHEM | 2020.03~2021.03 | E / P / C |
388 | BASF YEOSU PLANT HCL 35% EXTERNAL NEW PIPING DESIGN & APPROVAL | HANWHA SOLUTION | 2020.03~2020.06 | E |
387 | MDI 200,000TONS, CA, HYDROCHLORIC ACID OXIDATION FACILITY BASIC DESIGN | KUMHO MITSUI CHEM | 2020.03~2020.06 | E |
386 | 1 PLANT FLARE LOAD SUMMARY & PRESSURE VESSEL INSTALLATION RELATED DESIGN | KUMHO POLY CHEM | 2020.02~2020.05 | E |
385 | INSTALLATION OF 5 PETROCHEMICAL TANKS & DESIGN OF ADDITIONAL FACILITIES | MARINE GLORY | 2020.01~2021.12 | E |
384 | LOTTE CHEM INFRA-2 FEED DESIGN | LOTTE E&C | 2020.01~2020.03 | E |
383 | DETAIL DESIGN FOR 2,000MTY HIGH PURITY CO2 REFINING & FILLING FACILITY CONSTRUCTION PROJECT | WONIK MATERIALS | 2020.01~2020.03 | E |
382 | DETAIL DESIGN OF STEAM PIPING INSTALLATION FOR GS CALTEX MFC PLANT | HYUNDAI ENERGY | 2019.12~2020.01 | E |
381 | LG CHEM Y2C(YEOSU #2 COMPLEX) SAPO PIER EXTERNAL PIPING CONSTRUCTION | GS E&C | 2019.11~2020.09 | E / P / C |
380 | CHANGWON HYDROGEN LIQUEFACTION PROJECT APPROVAL & TECHNICAL SERVICE | DOOSAN HEAVY I&C | 2019.11~2020.03 | E |
379 | LG MMA M2 MTBE(METHYL TERTIARY BUTHYL ETHER) EXPANSION DESIGN | S&I CORP. | 2019.11~2020.12 | E |
378 | PIPE RACK SAFETY DIAGNOSIS OF EXTERNAL PIPELINES BETWEEN 10-2,3 SECTIONS | YEOSU TECHNICAL DIRECTOR’S COUNCIL | 2019.10~2020.03 | E |
377 | 80,000T/Y KAR(KUMHO ACETONE RECYCLE) PROJECT | KUMHO P&B CHEM | 2019.10~2021.05 | E / P / C |
376 | AIR LIQUID PIPE RACK STRUCTURE STABILITY REVIEW | HYUNDAI ENERGY | 2019.10~2019.10 | E |
375 | OA PRODUCTION TEAM CATALYTIC PROCESS EXPANSION DESIGN & APPROVAL | HANWHA CHEM | 2019.10~2021.01 | E |
374 | SBS(STYRENE BUTADIENE STYRENE) 45,000T REVAMPING PROJECT | KUMHO PETRO CHEM | 2019.10~2020.08 | E / P / C |
373 | MFC PROJECT - 3WHARF PERMIT SERVICE FOR THE 2ND PRODUCT PIER | GS CALTEX | 2019.10~2021.04 | E |
372 | NEW LOGISTICS BASE CONSTRUCTION | KUMHO MITSUI CHEM | 2019.10~2020.08 | E / P / C |
371 | GS CALTEX MFC(MIXED FEED CRACKER) OUTSIDE PIPE LINE INSTALLATION WORK | GS E&C | 2019.09~2020.11 | E |
370 | DETAILED DESIGN OF VCM1 EDC(ETHYLENE DICHLORIDE) REACTION PROCESS IMPROVEMENT | LG CHEM | 2019.09~2020.07 | E |
369 | GS CALTEX MFC(MIXED FEED CRACKER) OUTER PIPE LINE INSTALLATION WORK | GS E&C | 2019.09~2021.07 | E / C |
368 | WP4 MTO WORK IN INDONESIA LINE PROJECT | LOTTE E&C | 2019.08~2019.10 | E |
367 | KUMHO P&B CHEM BPA(BISPHENOL-A)-5 PROJECT | HYUNDAI ENG | 2019.08~2020.03 | E |
366 | DESIGN & APPROVAL FOR CATALYST MANUFACTURING FACILITIES IN 9 BLOCKS | KUMHO PETRO CHEM | 2019.08~2020.02 | E |
365 | DETAIL DESIGN OF SAP5 POWDER ASSEMBLY BACK-UP SYSTEM CONSTRUCTION | LG CHEM | 2019.07~2019.12 | E |
364 | NO.4 DIESEL HDS(87UNIT) CAPACITY INCREASE (75->80KBD) PERMIT SERVICE | GS CALTEX | 2019.06~2020.05 | E |
363 | KPB2 LER(LIQUID EPOXY RESINS) STORAGE TANK 6EA INSTALLATION DESIGN | DAEWOO PLANT | 2019.06~2019.11 | E |
362 | YEOSU STATION PIPERACK EXTENSION DESIGN PROJECT | E1 | 2019.05~2019.11 | E |
361 | DETAIL DESIGN OF LPG PIPE CONSTRUCTION FROM YEOSU PLANT TO E1 YEOSU STATION | GS CALTEX | 2019.05~2019.12 | E |
360 | BASIC DESIGN SERVICE FOR PIPE RACK EXPANSION PROJECT FOR THE INSTALLATION OF NEW PIPING BETWEEN PLANT 1 AND 2 | YNCC | 2019.04~2019.05 | E |