( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Project Client Period Scope
328 ESTABLISHMENT OF ACRYLIC RUBBER PRODUCTION PROCESS PROJECT(DESIGN) LG MMA 2018.07~2020.03 E
327 ESTABLISHMENT OF ACRYLIC RUBBER PRODUCTION PROCESS PROJECT LG MMA 2018.07~2020.02 E / P / C
326 MMA2 PLANT DESIGN OF ESTER WORK LG MMA 2018.07~2018.10 E
325 GS CALTEX SAR REVAMPING PROJECT PIPING 3D SCANNING & PERMIT DAWOO E&C 2018.07~2019.11 E
324 GABLE EXPANSION PROJECT VERSUM ADM KOREA 2018.07~2019.03 E / P / C
323 DESIGN-PLANT(PIPING)/YEOSU GROUP ENERGY UNDERGROUND STEAM PIPELINE GROUNDING PROJECT HYUNDAI E&C 2018.06~2019.09 E
322 REFINERY 3TEAM PSV DUALIZATION DETAIL DESIGN SERVICE GS CALTEX 2018.06~2019.05 E
321 CHEONGJU PLANT 1 CDA REVAMPING WORK(DETAILED DESIGN) SK AIR GAS 2018.06~2019.02 E
320 MDI(METHYLENE DIPHENYL ISOCYANATE) 60,000MTPA PLANT REVAMPING PROJECT KUMHO MITSUI CHEM 2018.06~2019.01 E / P / C
319 SIHWA OFFICE BUILDING REINFORCEMENT PROJECT VERSUM PM KOREA 2018.06~2018.10 E / P / C
318 NEW INSTALLATION M-EC520A1/A2 SYSTEM KUMHO MITSUI CHEM 2018.06~2018.07 P. C
317 DETAILED DESIGN RELATED TO THE REPLACEMENT OF LOW-VOLTAGE ELECTRICAL FACILITIES IN THE PLANT 1 YNCC 2018.06~2019.07 E
316 MFC FEED PROJECT (CIVIL DESIGN) GS E&C 2018.06~2019.05 E
315 BUTENE-1, RBD PROJECT BULK MATERIAL PURCHASE PROVISIONAL CONTRACT LG CHEM 2018.05~2019.01 E / P
314 DEMOLITION WORK AT SIHWA PLANT VERSUM MATERIALS 2018.05~2018.10 E / P / C
313 BPA 30,000TON REVAMPING DETAILED DESIGN AND 1 CASE LG CHEM 2018.05~2019.04 E
312 BDEP DEVELOPMENT FOR NEW STORAGE TANKS INSTALLATION SHELL KOREA 2018.06~2018.07 E
311 VRU(VAPOR RECOVERY UNIT) INSTALLATION LOTTE CHEM 2018.04~2018.11 P / C
310 OSBL PIPE RACK INSTALLATION PROJECT HANWHA CHEM 2018.04~2018.09 E / P / C
309 BUTENE-1, RBD PROJECT CONSTRUCTION LG CHEM 2018.04~2019.01 P / C
308 BASIC DESIGN PROJECT FARMHANNONG 2018.04~2018.04 E
307 SAP5(SUPER ABSORBENT POLYMER) 15,000 TON DBN PROJECT LG CHEM 2018.04~2018.10 E
306 DETAIL DESIGN FOR EXTENSION COMPLEX UTILITY CENTER & INFRASTRUCTURE CONSTRUCTION LG CHEM 2018.04~2019.03 E
305 2018 NCC PROJECT(LG CHEM NCC PROCESS IMPROVEMENT PROJECT) GS E&C 2018.04~2018.12 E
304 MIXTURE-1 PROJECT BASF 2018.03~2019.03 E / P / C
303 CA1 ELECTROLYZER PILOT FACILITY PROJECT LG CHEM 2018.03~2018.12 E / P / C
302 YEOSU CA2 GENERAL CONTRACTOR SERVEONE 2018.03~2019.12 E
301 JNJ(PDP) FEED DESIGN JAEWON INDUSTRIAL 2018.03~2018.07 E
300 PYEONGTAEK CMP(CHEMICAL MECHANICAL POLISHING) PROJECT VERSUM SPC KOREA 2018.03~2019.01 E / P / C
299 LG CHEM 6AA PROJECT SMS/PSM GS E&C 2018.03~2019.05 E
<< 1 2 3 4 5 6 7 [8] 9 10 / 18 > >>