( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
번호 | Project | Client | Period | Scope |
---|---|---|---|---|
298 | 9 BLOCK PIPE RACK DESIGN | HANWHA ENERGY | 2018.02~2018.11 | E |
297 | CONSTRUCTION OF DISPERSANT SEMI-MASS PRODUCTION FACILITY & SUSPENSION POLYMERIZATION PILOT RECONSTRUCTION | LG MMA | 2018.02~2018.05 | E |
296 | K-PIA, PTA IG DRYER VENT GAS PREVENTION FACILITY(ACTIVATED CARBON ADSORPTION TOWER) PRODUCTION AT ULSAN PLANT | LOTTE CHEM | 2018.02~2018.09 | E / P |
295 | ALCHEMY PROJECT (CSP 80MTPY + AMP 15MTPY NEW) | VERSUM PM KOREA | 2018.02~2019.02 | E / P / C |
294 | LIQUID EPOXY RESIN(III) 45,000T/Y LP & LTI PROCESS PROJECT | KUMHO P&B CHEM | 2018.01~2019.06 | E / P / C |
293 | COMPLEMENTARY WORK RELATED TO COLOR IMPROVEMENT | KUMHO MITSUI CHEM | 2018.01~2018.04 | E / P / C |
292 | GOJI PROJECT BASIC ENGINEERING | AISA STABILIZERS | 2018.01~2018.04 | E |
291 | LIVESTOCK MANURE REGIONAL INTEGRATED MANAGEMENT CENTER RESOURCE CONVERSION PILOT PROJECT | YEONGJU NONGHYUP | 2018.01~2019.10 | E / P / C |
290 | YEOSU LG CHEM SAP5(SUPER ABSORBENT POLYMER) REVAMPING PROJECT | SERVEONE | 2017.11~2019.05 | E |
289 | DETAIL DESIGN FOR RFCC(RESIDUE FLUID CATALYTIC CRACKING UNIT) WET GAS SCRUBBER INSTALLATION | GS CALTEX | 2017.11~2019.10 | E |
288 | NUMAT PROJECT | VERSUM MATERIALS | 2017.11~2018.03 | E / P / C |
287 | CRF #3,4 BASIC ENGINEERING PACKAGE SERVICE | FARMHANNONG | 2017.11~2019.02 | E |
286 | GS CALTEX VGOFCC(VGO FLUIDIZED CATALYTIC CRACKER) PROJECT | GS E&C | 2017.10~2018.04 | E |
285 | ONSAN PLANT SS BOILER AND LP ETHYLENE TANK DETAILED DESIGN | KPIC | 2017.10~2019.04 | E |
284 | SK HYNIX M14 PHASE2B GAS PLANT PROJECT DESIGN | SK AIR GAS | 2017.10~2018.11 | E |
283 | DESIGN RELATED TO INVESTMENT OTHER THAN INSTALLATION OF U-GA206D | KUMHO MITSUI CHEM | 2017.09~2017.11 | E |
282 | THE PROJECT OVERALL DESIGN SERVICE | HANWHA E&C | 2017.09~2019.06 | E |
281 | LG MMA M3 REVAMPING PROJECT (GENERAL CONTRACTOR) | SERVEONE | 2017.09~2019.08 | E |
280 | MVR DESIGN PROJECT | SEA ENG | 2017.09~2019.03 | E |
279 | MDI 340,000MTPA PLANT PRODUCT SHIPPING SITE IMPROVEMENT WORK | POSCO E&C | 2017.08~2018.04 | P |
278 | THAILAND EFFICIENCY, ENERGY AND ENVIRONMENT(3E) PROJECT(DESIGN) | HYUNDAI ENG | 2017.07~2018.02 | E |
277 | MOKPO STORAGE VRU(VAPOR RECOVERY UNIT) PACKAGE & CONCRETE INSTALLATION WORK | S-OIL | 2017.06~2017.12 | E / P / C |
276 | SS PROJECT EPC LUMP & SUM TURNKEY PROJECT (CH3F 20TON/Y) | SK SHOWA DENKO | 2017.06~2018.12 | E / P / C |
275 | 3NE PROJECT | GS E&C | 2017.05~2019.04 | E |
274 | SER(SOLID EPOXY RESINS) STEP II 15,000MTPA REVAMPING PROJECT | KUMHO P&B CHEM | 2017.05~2018.02 | E / P / C |
273 | RESEARCH SERVICE FOR INSTALLING ADDITIONAL PIPING DUE TO SATURATION OF UNDERGROUND PIPING IN ONSAN NATIONAL INDUSTRIAL COMPLEX IN ULSAN | KICOX | 2017.05~2017.11 | E |
272 | INSTALLATION OF LINE AND HEAT EXCHANGER FOR INTEGRATED OPERATION OF PP REFRIGERATOR | KUMHO POLY CHEM | 2017.04~2017.10 | E / P / C |
271 | HCC THE PROJECT | HYUNDAI E&C | 2017.04~2017.08 | E |
270 | SIHWA BDP PROJECT ENGINEERING | VERSUM MATERIALS | 2017.04~2017.06 | E |
269 | TOURBILLON PROJECT DIKE INSTALLATION | BASF | 2017.04~2017.06 | E / P / C |