359 | 2019 SHUTDOWN INVESTMENT CONSTRUCTION PROJECT | KUMHO MITSUI CHEM | 2019.04~2019.06 | E / P / C |
358 | TANK REVAMPING PROJECT DESIGN & APPROVAL | PMC TECH | 2019.04~2020.03 | E |
357 | TPV(THERMO PLASTIC VULCANIZATE) PLANT PROCESS IMPROVEMENT PROJECT | KUMHO POLY CHEM | 2019.04~2019.07 | E / P / C |
356 | HIGH TEMPERATURE NYLON A4 MASS PRODUCTION PROCESS BASIC DESIGN FEED | LOTTE CHEM | 2019.03~2019.08 | E |
355 | BASIC DESIGN FOR DAESAN GE PROCESS BDG PRODUCTION PROCESS | LOTTE CHEM | 2019.03~2019.08 | E |
354 | GS CALTEX MFC(MIXED FEED CRACKER) PROJECT (PIPING/ELEC./INSTR./CIVIL) | GS E&C | 2019.02~2021.04 | E |
353 | CDC PROJECT ORGANIC CATALYST & OSBL DETAIL DESIGN SERVICE | S&I CORP. | 2019.02~2020.01 | E |
352 | REPLACING MMA(METHYL METHACRYLATE) PROCESS INSTRUMENT & LINE IN MMA3 PLANT | LG MMA | 2019.02~2019.11 | E / P / C |
351 | MMA3 PLANT MA PRODUCT TOWER REPLACEMENT AND INSTALLATION | LG MMA | 2019.02~2019.11 | E |
350 | ETHYLENE & BTX(BENZENE TOLUENE XYLENE) AREA ENERGY SAVING PROJECT | YNCC | 2019.01~2019.06 | E / P / C |
349 | PETROCHEMICAL 2TEAM NO.2 AROMATICS PROCESS THROUGHPUT INCREASE BASIC/DETAILED DESIGN AND PERMIT | GS CALTEX | 2019.01~2019.10 | E |
348 | VCU FACILITY MANUFACTURING INSTALLATION AND DESIGN(TERMINAL 2) | KOREA VOPAK TERMINAL | 2018.12~2020.12 | E / P / C |
347 | VCU FACILITY MANUFACTURING INSTALLATION AND DESIGN(TERMINAL 1) | KOREA VOPAK TERMINAL | 2018.12~2020.12 | E / P / C |
346 | SIHWA GABLE-INFRASTRUCTURE EPC PROJECT | VERSUM PM KOREA | 2018.12~2019.05 | E / P / C |
345 | DAESAN PLANT D-EG ½ WASTE HEAT RECOVERY ENERGY SAVING PROJECT | LOTTE CHEM | 2018.12~2019.11 | E / P / C |
344 | PELLET STEP II PROJECT | KUMHO POLY CHEM | 2018.12~2019.10 | E / P / C |
343 | TURKMENISTAN, MTO PROJECT | KOREA PLANT INDUSTRY ASSOCICATION | 2018.12~2019.07 | E |
342 | CONSTRUCTION OF PIPING 3D INSPECTION DRAWINGS(OUTSIDE THE FACTORY) | GS CALTEX | 2018.12~2019.06 | E |
341 | CONSTRUCTION OF 3D INSPECTION DRAWING FOR OFFSITE PIPING IN THE PLANT 1 | GS CALTEX | 2018.12~2019.06 | E |
340 | LG CHEM Y2C PROJECT (ETHYLENE 800,000MT/Y) | GS E&C | 2018.11~2021.06 | E |
339 | PLANT 2 DEBOTTLENECKING PRE-ENGINEERING | KUMHO POLY CHEM | 2018.11~2019.01 | E |
338 | WASTEWATER TREATMENT PLANT REVAMPING DETAILED DESIGN AND PERMIT | Q-BIO TECH | 2018.11~2019.07 | E |
337 | FEASIBILITY STUDY(YEOSU PLANT~E1 LPG PIPE SEISMIC DESIGN RELATED) | GS CALTEX | 2018.10~2019.01 | E |
336 | VGOFCC(VGO FLUIDIZED CATALYTIC CRACKER) SLURRY FILTER TRAIN ADDITIONAL INSTALLATION - BASIC DESIGN | GS CALTEX | 2018.10~2018.12 | E |
335 | BASIC DESIGN FOR TRANSFER OF DRUM PACKING SYSTEM TO OUTSIDE OF MMA3 PLANT | LG MMA | 2018.09~2018.12 | E |
334 | DESIGN OF GROUNDING PROJECT FOR EXTERNAL PIPING BETWEEN PLANT AND OIL STORAGE TAM(ANTI-AGING) | GS CALTEX | 2018.09~2019.03 | E |
333 | TECHNICAL TEAM SF300B DEDICATED LINE TIC AND BASIC DESIGN | LG MMA | 2018.09~2018.12 | E |
332 | GS CALTEX SAR REVAMPING PROJECT / PIPING DETAILED DESIGN | DAWOO E&C | 2018.08~2019.11 | E |
331 | STT(I) STORAGE FACILITIES INSTALLATION | KUMHO P&B CHEM | 2018.07~2020.01 | E / P / C |
330 | DETAILED DESIGN FOR IMPROVEMENT INVESTMENT IN EG CO2 REMOVAL SYSTEM | LG CHEM | 2018.07~2019.05 | E |