140 | DETAIL DESIGN FOR REVAMPING OF KUMHO MITSUI CHEM WASTE WATER TREATMENT PLANT | Q-BIO TECH | 2018.11~2019.07 | E |
139 | PLANT 2 DEBOTTLENECKING PRE-ENGINEERING | KUMHO POLY CHEM | 2018.11~2019.01 | E |
138 | DESIGN OF EXTERNAL PIPING GROUNDING PROJECT BETWEEN FACTORY AND CRUDE OIL STORAGE TEAM (ANTI-AGING) | GS CALTEX | 2018.09~2019.03 | E |
137 | ACRYLIC IMPACT REINFORCING AGENT PRODUCTION PROCESS CONSTRUCTION WORK | LG MMA | 2018.07~2020.02 | E / P / C |
136 | STT(SHORE TANK TERMINAL)I STORAGE INSTALLATION PROJECT | KUMHO P&B CHEM | 2018.07~2020.01 | E / P / C |
135 | GS CALTEX SAR REVAMPING PROJECT PIPING 3D SCANNING & PERMIT | DAEWOO E&C | 2018.07~2019.06 | E |
134 | EG CO2 DETAILED INVESTMENT DESIGN | LG CHEM | 2018.07~2019.05 | E |
133 | GABLE EXPANSION PROJECT | VERSUM ADM KOREA | 2018.07~2019.05 | E / P / C |
132 | YEOSU GROUP ENERGY UNDERGROUND STEAM PIPING GROUND DESIGN | HYUNDAI E&C | 2018.06~2019.09 | E |
131 | MDI 60,000MTPA PLANT REVAMPING PROJECT | KUMHO MITSUI CHEM | 2018.06~2019.07 | E / P / C |
130 | NEW INSTALLATION OF M-EC520A1/A2 SYSTEM | KUMHO MITSUI CHEM | 2018.06~2018.07 | E / P / C |
129 | LG CHEM BPA 30,000MT DEBOTTLENECKING DESIGN PROJECT | LG CHEM | 2018.05~2019.04 | E |
128 | HCC PETROLEUM RESIN PLANT PIPING CONSTRUCTION DESIGN | HANWHA | 2018.05~2018.11 | E |
127 | SAP5 15,000 TON DBN PROJECT | LG CHEM | 2018.04~2019.06 | E |
126 | DETAIL DESIGN OF M-EC520A1/A2/A3 EVAPORATOR | KUMHO MITSUI CHEM | 2018.04~2018.10 | E |
125 | INVESTMENT PROJECT FOR PLANT MAINTENANCE OF YNCC #3 FACTORY IN 2018 | YNCC | 2018.04~2018.07 | E |
124 | 3D SCANNING WORK INSIDE #1 PX ADSORBENT TOWER | S-OIL | 2018.04~2018.05 | E |
123 | BASIC DESIGN PACKAGE OF BANWOL PLANT | FARMHANNONG | 2018.04~2018.05 | E |
122 | LG CHEM 6AA PROJECT SMS/PSM | GS E&C | 2018.03~2019.05 | E |
121 | CA1 ELECTROLYZER PILOT FACILITY PROJECT | LG CHEM | 2018.03~2018.12 | E / P / C |
120 | ALCHEMY PROJECT | VERSUM MATERIALS PM KOREA | 2018.02~2019.08 | E / P / C |
119 | CONSTRUCTION OF DISPERSANT SEMI-MASS PRODUCTION FACILITY & SUSPENSION POLYMERIZATION PILOT RECONSTRUCTION | LG MMA | 2018.02~2018.05 | E |
118 | LER(Ⅲ) PROJECT | KUMHO P&B CHEM | 2018.01~2019.06 | E / P / C |
117 | GOJI PROJECT BASIC ENGINEERING | AISA STABILIZERS | 2018.01~2018.04 | E |
116 | YEOSU LG CHEM SAP5 REVAMPING PROJECT | SERVEONE | 2017.11~2019.05 | E |
115 | NUMAT PROJECT | VERSUM MATERIALS | 2017.11~2018.03 | E / P / C |
114 | SSB & LET PROJECT | KOREA PETRO CHEM | 2017.10~2019.04 | E |
113 | DETAIL DESIGN OF SK HYNIX M14 PHASE2B GAS PLANT PROJECT | SK AIR GAS | 2017.10~2018.11 | E |
112 | INVESTMENT RELATED DESIGN SERVICE BESIDE INSTALLATION OF U-GA206D | KUMHO MITSUI CHEM | 2017.09~2017.11 | E |
111 | 3NE PROJECT | GS E&C | 2017.05~2019.04 | E |