( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
번호 | Project | Client | Period | Scope |
---|---|---|---|---|
110 | SER(II) PROJECT | KUMHO P&B CHEM | 2017.05~2018.02 | E / P / C |
109 | ADDITIONAL PIPING INSTALLATION PLAN DUE TO SATURATION OF UNDERGROUND PIPING AT ULSAN ONSAN NATIONAL INDUSTRIAL COMPLEX | KICOX | 2017.05~2017.11 | E |
108 | LG CHEM DAESAN PLANT BD&BUTENE-1 FACTORY 3D SCANNING & MODELING | LG CHEM | 2017.05~2017.08 | E |
107 | ULSAN PLANT SPP PROJECT | KPIC | 2017.03~2018.07 | E |
106 | GS CALTEX No.1 CDU(CRUDE DISTILLATES UNIT) REVAMP PROJECT | GS E&C | 2017.03~2018.05 | E |
105 | W-TFT CA1 TEAM 35% HYDROCHLORIC ACID SHIPPING INFRASTRUCTURE CONSTRUCTION WORK | HANWHA CHEM | 2017.02~2017.09 | E / P / C |
104 | IMPROVEMENT CONSTRUCTION FOR MDI EXTENSION BOTTLENECK ELIMINATION | KUMHO MITSUI CHEM | 2017.02~2017.04 | E / P / C |
103 | 3D INSPECTION DRAWING DESIGN FOR OFF-SITE PIPING IN GS CALTEX 1 FACTORY | GS CALTEX | 2017.01~2018.12 | E |
102 | GUNSAN PLANT, AGRICULTURAL WATER UTILIZATION FACILITY INSTALLATION CONSTRUCTION | OCI | 2017.01~2017.08 | E / P / C |
101 | LG MMA YEOSU MAA 50,000T PROJECT TIC | SERVEONE | 2017.01~2017.01 | E |
100 | Y2 REVAMP(CO2 RECYCLE) PROJECT | AIR LIQUIDE KOREA | 2016.12~2017.11 | E / P / C |
99 | W-3 PLANT INSTALLATION PROJECT | SK MATERIALS | 2016.12~2017.10 | E / P / C |
98 | A.RUBBER SYSTEM CONSTRUCTION DESIGN | LG MMA | 2016.12~2017.10 | E |
97 | ABS 65K DEBOTTLENECKING PROJECT | LOTTE CHEM | 2016.12~2017.08 | E / P / C |
96 | HDO REVAMPING EPC PROJECT DESIGN | HYUNDAI ENG | 2016.11~2018.12 | E |
95 | STT(I) EXTERNAL STORAGE FACILITIES INSTALLATION | KUMHO P&B CHEMICAL | 2016.11~2017.07 | E / P / C |
94 | JO MDI 4,000M3 STORAGE TANK INSTALLATION | KUMHO MITSUI CHEM | 2016.11~2017.04 | E / P / C |
93 | KTPV(Thermo Plastic Vulcanizate)-II PROJECT | KUMHO POLY CHEM | 2016.10~2017.12 | E / P / C |
92 | MVR(IV) PROJECT | KUMHO P&B CHEM | 2016.10~2017.01 | E / P / C |
91 | C5 PLANT VLCC INSTALLATION | YNCC | 2016.10~2016.12 | E |
90 | NO.2 KD/HDS DEWAXING SYSTEM IMPROVEMENT | GS CALTEX | 2016.08~2017.05 | E |
89 | NAKPOGAC THREE TANK CONSTRUCTION PROJECT (SYP-1601) | SY TANK TERMINAL | 2016.08~2017.04 | E |
88 | 2-LINE FACILITY SUPPLEMENTARY CONSTRUCTION DESIGN | KUMHO POLYCHEM | 2016.06~2016.11 | E |
87 | PC FACILITY DEBOTTLENECKING BASIC DESIGN | LG CHEM | 2016.06~2016.10 | E |
86 | DETAIL DESIGN ON THE INSTALLATION OF 2 WASTE WATER STORAGE TANK | YNCC | 2016.06~2016.08 | E |
85 | MDI-PH CONTINUOUS CRYSTALLIZER INSTALLATION WORK | KUMHO MITSUI CHEM | 2016.05~2017.04 | E / P / C |
84 | 1 PLANT 1-LINE MVR INSTALLATION | KUMHO POLYCHEM | 2016.05~2016.12 | E / P / C |
83 | SYNGAS COOLER REPLACEMENT EPC CONTRACT | LOTTE BP CHEM | 2016.04~2017.05 | E / P / C |
82 | E1 MIXED-C4 TRANSPORT-RELATED CONSTRUCTION PROJECTS | E1 | 2016.03~2018.10 | E / P / C |
81 | C9 COLUMN → REFORMATE COLUMN CHANGE | GS CALTEX | 2016.03~2017.03 | E |