( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Project Client Period Scope
80 GS CALTEX ULSAN PLANT KILN PROCESS WASTE HEAT RECOVERY SYSTEM FEASIBILITY STUDY GS CALTEX 2016.03~2016.04 E
79 GWANGYANG PLANT BTX DBNK PROJECT - PIPING ENGINEERING WORK OCI 2016.02~2017.01 E
78 120D-830/926 TANK FORM FIREFIGHTING SYSTEM DESIGN GS CALTEX 2016.01~2016.03 E
77 LG CHEM PC PLANT HEAT PUMP INSTALLATION PROJECT SERVEONE 2015.12~2015.12 E / P / C
76 INSTALLING HEAT PUMP(PC PLANT) LG CHEM 2015.12~2015.12 E / P / C
75 POLYMERIZATION G-LINE NB LATEX PARALLEL PRODUCTION FACILITY BUILT EPC KUMHO PETRO CHEM 2015.11~2017.07 E / P / C
74 AROMATIC OFF-GAS BENZENE RECOVERY DESIGN SERVICES GS CALTEX 2015.11~2016.12 E
73 AMS CAPA-UP PROJECT KUMHO P&B CHEMICAL 2015.11~2016.06 E / P / C
72 YNCC 2PLANT ENERGY-SAVING PROJECT YNCC 2015.11~2016.04 E / P / C
71 CVD REACTOR INSTALLATION & NEW PUMP CONSTRUCTION HANWHA SILICON 2015.10~2015.10 E
70 PP3 PROJECT HYOSUNG 2015.08~2016.12 E
69 PB2 100,000 MTA REVAMPING PROJECT DAELIM INDUSTRIAL 2015.07~2017.07 E / P / C
68 S-OIL SUPER PKG 1,2 3D LASER SCAN DAELIM INDUSTRIAL 2015.07~2016.10 E
67 NO.1 AROMATICS HEAT EXCHANGER IMPROVEMENT GS CALTEX 2015.07~2016.04 E
66 NO.2 PMMA MS PRODUCTION FACILITY BUILDING CONSTRUCTION LG MMA 2015.07~2016.01 E / P / C
65 LP-1 RECOVERY PROCESS, DETAIL DESIGN FOR INCREASE CAPACITY HANWHA CHEM 2015.07~2015.10 E
64 MTPX ENERGY EFFICIENCY DESIGN SERVICE GS CALTEX 2015.06~2016.05 E
63 MVR II PROJECT KUMHO P&B CHEM 2015.06~2016.04 E / P / C
62 PSV REAR-END EMISSION TREATMENT SYSTEM CONSTRUCTION LG CHEM 2015.06~2015.12 E
61 C1-POWDER PACKAGING BASIC DESIGN ORION 2015.06~2015.09 E
60 J-LINE STRIPPER ADDITIONAL INSTALLATION KUMHO PETRO CHEM 2015.06~2015.06 E
59 KP-I PLANT 2-LINE MVR PROJECT KUMHO POLY CHEM 2015.04~2015.11 E / P / C
58 P2 CVD HEAT RECOVERY SYSTEM OCI 2015.04~2015.09 E / P / C
57 MATERIAL CONVERSION PROJECT DEOKYANG 2015.03~2015.12 E / P / C
56 PMMA1 PLANT, 3 TANK INSTALLATION LG-MMA 2015.02~2015.07 E / P / C
55 INSTALLING TWO C4 BALL TANK KUMHO PETRO CHEM 2015.01~2015.12 E / P / C
54 PB2 75,000 MTA REVAMPING PROJECT DAELIM 2014.11~2016.05 E
53 POLY SILICON CAPA-UP DETAIL DESIGN HANWHA CHEM 2014.11~2015.08 E
52 COC(COCL2) COMPRESSOR INSTALLATION KUMHO MITSUI CHEM 2014.11~2015.06 E / P / C
51 DAESAN EG(ETHYLENE GLYCOL)1 PLANT DB(DEBOTTLENECK) PROJECT LOTTE E&C 2014.10~2016.09 E / P / C