( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Project Client Period Scope
119 CM2 BASIC ENGINEERING DOCUMENT PACKAGE PROJECT HANWHA CHEM 2012.01~2012.02 E
118 NEW PLANT WASTE HEAT RECOVERY SYSTEM INSTALLATION KUMHO POLY CHEM 2012.01~2013.07 E / P / C
117 DESIGN FOR GS CALTEX VGOFCC(VGO FLUIDIZED CATALYTIC CRACKER) PROJECT SAPO-PIPE LINE (PIPING/ELEC./INSTR./CIVIL) GS E&C 2011.11~2013.04 E
116 MIBK(DIISOBUTYL KETONE) 55KT CAPA UP PROJECT KUMHO P&B CHEM 2011.10~2012.10 E / P / C
115 TAME(TERTIARY AMYL ETHER) PROJECT GS E&C 2011.10~2013.05 E
114 BASIC CIVIL DESIGN AMONG HCC BELT CONVEYOR INSTALLATION PROJECT HANWHA E&C 2011.09~2012.03 E / CS
113 Hx REFINE PROCESS IMPROVEMENT PROJECT KOREA PETRO CHEM 2011.09~2012.06 E
112 #4 KERO MEROX(KEROSENE UNIT) PROJECT GS E&C 2011.08~2013.04 E / PS / CS
111 KOREA SILICON 2ND STEAM LINE DETAILED DESIGN YCOGEN 2011.08~2012.04 E
110 MDI(METHYLENE DIPHENYL ISOCYANATE) 50,000MT REVAMPING PROJECT KUMHO MITSUI CHEM 2011.07~2012.06 E / P / C
109 DETAILED DESIGN FOR INSTALLATION OF LDPE SECONDARY EXTRUDER(FOR IT PROTECTION FILM) LG CHEM 2011.07~2011.12 E
108 4AA PROJECT CONSTRUCTION FIELD ENGINEERING (PIPING/ELEC./INSTR./CIVIL) GS E&C 2011.07~2012.05 FE
107 INJU N20 PLANT & CYLINDER FILLING STATION DESIGN LINDE KOREA 2011.06~2012.06 E / FE
106 NO.3 OFF-SITE SUBSTATION EXPANSION AND 2 OTHERS GS CALTEX 2011.05~2011.07 E
105 NCC(NAPHTHA CRACKING CENTER) SCORE FURNACE REVAMPING PROJECT LG CHEM DAESAN 2011.04~2012.07 E
104 KERO SPLITTER INSTALLATION PROJECT GS CALTEX 2011.03~2011.11 E
103 GSC VGOFCC PROJECT DETAILED DESIGN(PIPING/INSTR./CIVIL) GS E&C 2011.03~2013.03 E
102 MDA(METHYLENE DIPHENYL AMINE) REVAMPING PROJECT KUMHO MITSUI CHEM 2011.03~2011.07 E / P / C
101 CA/EDC (CAUSTIC/ETHYLENE DICHLORIDE) PROJECT LG CHEM 2011.02~2011.07 E
100 L-LDPE(LOW DENSITY POLYETHYLENE) PLANT ELASTOMER 13,000TON DEBOTTLENECK PROJECT LG CHEM 2011.01~2012.03 E / P / C
99 STEAM PIPING DESIGN HYUNDAI E&C 2010.12~2012.06 E
98 OTK NO.4 EXPANSION PROJECT ISU E&C 2010.12~2012.03 E
97 INTRODUCTION OF TVR AND STEAM ACCUMULATOR S-OIL 2010.12~2011.07 E / P / C
96 P-52141 CATALYST DEVELOPMENT UNIT ENGINEERING SERVICE ALBEMARLE KOREA 2010.09~2011.06 E / PS / CS
95 HONAM PETRO CHEM HPEO(HIGH PURITY ETHYLENE OXIDE) PROJECT LOTTE E&C 2010.12~2012.10 E / P / C
94 U-5500 PHENOL TREATMENT PROJECT KUMHO P&B CHEM 2010.11~2011.05 E / P / C
93 LG CHEM 4AA PROJECT (MECHANICAL/PIPING/ELEC./INSTR./CIVIL DESIGN) GS E&C 2010.11~2012.07 E / PS
92 PP PLANT EXTENSION PROJECT LG CHEM 2010.08~2011.09 E
91 OIL REFINING 3TEAM ATMOSPHERE EMISSION UNIT IMPROVEMENT GS CALTEX 2010.08~2011.07 E / PS
90 YEOSU COGENERATION PLANT DE-COMPRESS YCOGEN 2010.08~2011.05 E / P / C