( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
번호 | Project | Client | Period | Scope |
---|---|---|---|---|
200 | 3rd FACTORY EXTERNAL PIPING PIPE RACK NEW PROJECT | KUMHO P&B CHEM | 2022.07~2023.07 | E / P / C |
199 | PBAT 3,000MTPA PROJECT | LG CHEM | 2022.07~2023.03 | E / P / C |
198 | TIAFENACIL PRODUCTION FACILITY BASIC DESIGN | FARMHANNONG | 2022.07~2022.09 | E |
197 | NEW 250,000MTPA HPEO REFINING FACILITY IN DAESAN EG-1 PLANT | LOTTE CHEM | 2022.06~2023.12 | E / P / C |
196 | VANADIUM ELECTROLYTE 480MTPA PRODUCTION PLANT CONSTRUCTION | LOTTE CHEM | 2022.05~2023.06 | E / P / C |
195 | DESIGN SERVIED RELATED TO DISSOLVED REFINED SALT BUSINESS(PHASE 1) | HANJU | 2022.05~2022.09 | E |
194 | 1,2 FACTORY PLANT IMPROVEMENT DESIGN | KUMHO POLY CHEM | 2022.04~2022.12 | E |
193 | YEOSU NCC 2 PLANT RAW C5 EXPANSION DETAILED DESIGN | LG CHEM | 2022.02~2022.12 | E |
192 | LP PROCESS 60KTA NEW REVAMPING PROJECT | KUMHO P&B CHEM | 2022.01~2023.04 | E / P / C |
191 | ABS PLANT FLARE STACK NEW CONSTRUCTION DETAILED DESIGN | LG CHEM | 2021.12~2023.03 | E |
190 | 3 LINE DEBOTTLENECKING PROJECT RELATED WORK | KUMHO POLY CHEM | 2021.12~2022.08 | E / P / C |
189 | DETAILED DESIGN SERVICE RELATED TO THE EXTENSION OF 3 NMP TOWERS AT THE HUNGARY PLANT | JAEWON INDUSTRIAL | 2021.12~2022.05 | E |
188 | 4 LINE MVR(UC-403) NEW INSTALLATION PROJECT RELATED WORK | KUMHO POLY CHEM | 2021.11~2022.11 | E / P / C |
187 | CHEMICAL ACCIDENT RESPONSE TRAINING CENTER ENVIRONMENTAL FACILITY SIMULATOR PRODUCTION | CHEMICAL SAFETY AGENCY | 2021.11~2022.04 | E / P / C |
186 | TRANSPARENT ABS DEBOTTLENECKING PROJECT | LG CHEM | 2021.11~2022.04 | E |
185 | JEONYOUNG R.G.O GWANGYANG PROJECT | JEONYOUNG R.G.O | 2021.10~2022.06 | E |
184 | SSBR 60,000T PROJECT | KUMHO PETRO CHEM | 2021.08~2022.12 | E / P / C |
183 | ABS DP 220,000TONS REVAMPING PROJECT FEED DESIGN | LG CHEM | 2021.08~2021.12 | E |
182 | NO.2 MDI PLANT PROJECT(MDI&FOX) DESIGN, EQUIPMENT DELIVERY SERVICE | KUMHO MITSUI CHEM | 2021.06~2023.12 | E / P / C |
181 | JAC20 PROJECT DETAIL DESIGN SERVICE | JAEWON INDUSTRIAL | 2021.05~2021.10 | E |
180 | 410KTA PLANT 3D DESIGN | KUMHO MITSUI CHEM | 2021.04~2021.12 | E |
179 | FACTORY 1 RTO-2 NEW INSTALLATION WORK | KUMHO POLY CHEM | 2021.04~2021.11 | E / P / C |
178 | POHANG PLANT HSPP-MPR-001-PILOT PACKAGE MANUFACTURING WORK | OCI | 2021.03~2021.06 | E / P / C |
177 | EPC WORKS FOR PIPING AMONG LOTTE CHEMICAL 6BLOCK INFRA2 PROJECT | SGC E-TEC E&C | 2021.02~2022.04 | E / P / C |
176 | CHANGWON HYDROGEN LIQUEFACTION PROJECT (BASIC AND DETAILED DESIGN) | DOOSAN HEAVY I&C | 2021.01~2023.02 | E |
175 | PUMP INSTALLATION DESIGN | PMC TECH | 2021.01~2021.03 | E |
174 | 2021 ABS CAPA UP BASIC DESIGN AND FEED | LOTTE CHEM | 2021.01~2021.04 | E |
173 | BUTANE BLENDING PROJECT | YTT | 2021.01~2021.03 | E / P / C |
172 | DETAILED DESIGN FOR PVC SL-3 REVAMPING | LG CHEM | 2020.12~2022.11 | E |
171 | ANNUAL OUTPUT OF 65,000 TONS LITHIUM BATTERY CATHODE MATERIAL (1-1 UNITS) PROJECT | KOREA JAESAE NEUNGWON | 2020.11~2021.09 | E |