번호 | Project | Client | Period | Scope |
---|---|---|---|---|
14 | WSR SPLITTER PROJECT ELECTRICAL CONSTRUCTION SUPERVISION | GS CALTEX | 2005.10~2006.07 | CS |
13 | NO.1 SUPERVISION OF ELECTRICAL CONSTRUCTION FOR REPLACEMENT OF AROMATICS HIGH VOLTAGE PANEL | GS CALTEX | 2005.09~2005.10 | CS |
12 | ABS2-H1 PRODUCTIVITY IMPROVEMENT PROJECT ELECTRICAL CONSTRUCTION SUPERVISION | LG CHEM | 2005.06~2005.10 | CS |
11 | SUPERVISION OF ELECTRICAL CONSTRUCTION FOR HYPOL POWER FACILITIES | KUMHO PETRO CHEM | 2005.06~2005.10 | CS |
10 | FIREFIGHTING CONSTRUCTION SUPERVISION FOR YNCC EB/SM REVAMPING PROJECT AND COOLING TOWER EXPANSION WORK | DAELIM INDUSTRIAL | 2005.05~2005.12 | FS |
9 | SUPERVISION OF FIREFIGHTING WORK FOR THE CONSTRUCTION OF YEOSU RESERVOIR AT SUHYUP FEDERATION | KUMHO ENC | 2005.05~2005.11 | FS |
8 | FIREFIGHTING WORK SUPERVISION FOR CONSTRUCTION OF YEOSU RESERVOIR | KUMHO ENC | 2005.05~2005.08 | FS |
7 | GS CALTEX SSANGBONG HOUSE RECEIVING FACILITY IMPROVEMENT ELECTRICAL CONSTRUCTION SUPERVISION | GS CALTEX | 2005.05~2005.05 | CS |
6 | SUPERVISION OF ELECTRICAL CONSTRUCTION RELATED TO INSTALLATION OF EXCELLENT PUMPS BY ONSHORE SHIPPING TEAM | GS CALTEX | 2005.03~2005.05 | CS |
5 | PVC CAPA UP PROJECT ELECTRICAL CONSTRUCTION SUPERVISION | HANWHA CHEM | 2004.09~2004.12 | CS |
4 | KPA (III) PROJECT ELECTRICAL CONSRUCTION SUPERVISION | KUMHO P&B CHEM | 2004.05~2005.03 | CS |
3 | HEG 6.6/3.3KV HIGH VOLTAGE PANEL REPLACEMENT ELECTRICAL CONSTRUCTION SUPERVISION | HONAM PETRO CHEM | 2004.04~2004.04 | CS |
2 | FINISHING FACILITY CHANGE ELECTRICAL CONSTRUCTION SUPERVISION | KUMHO POLY CHEM | 2004.03~2004.04 | CS |
1 | NCC #1 IDF MOTOR REPLACEMENT, HIGH VOLTAGE POWER SUPPLY ELECTRICAL CONSTRUCTION SUPERVISION | YNCC | 2003.11~2004.01 | CS |