MVR

( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Item Project Client Year Scope
12 MVR 4-Line MVR(UC-403) new installation Project KUMHO POLY CHEM 2021 E / P / C
11 MVR MVR(IV) Project (Surplus steam 10T/hr 0.4㎏/㎠G→2.8㎏/㎠G Booster Production) KUMHO P&B CHEM 2016 E / P / C
10 MVR 1Factory 1-Line MVR Installation Project (using 96.6℃ Waste gas, 2.4㎏/㎠G 16.5Ton/hr Steam Production) KUMHO POLY CHEM 2016 E / P / C
9 MVR KP-I Plant 2-Line MVR Project (using Low heat source steam, -0.88㎏/㎠G 22.4Ton/hr Steam Production) KUMHO POLY CHEM 2015 E / P / C
8 MVR MVR(II) Project (using Surplus Hot Oil, 4.5㎏/㎠G 25Ton/hr Steam Production) KUMHO P&B CHEM 2015 E / P / C
7 MVR MVR Package manufacture and installation work(50Ton/hr 6.9㎏/㎠G→21㎏/㎠G, 12Ton/hr 9.8㎏/㎠G→35.2㎏/㎠G Boost) KUMHO MITSUI CHEM 2015 E / P / C
6 MVR MPC Reaction Tower MVR Project (using Waste heat, 10.5㎏/㎠G 12.6Ton/hr Steam Production) LOTTE CHEM 2014 E / P / C
5 MVR Samsung Total Chem MVR Package Project (Surplus steam 50Ton/hr 2.5㎏/㎠G→5.4㎏/㎠G Boost Production) SAMSUNG TECHWIN 2014 E / P / C
4 MVR Construction of new plant waste heat recovery system (using 98℃ Waste heat 1.2㎏/㎠G 15.8Ton/hr Steam Production) KUMHO POLY CHEM 2012 E / P / C
3 MVR MDI 50,000MT MVR Project (Surplus steam 6.6Ton/hr 7㎏/㎠G →18㎏/㎠G Boost Production) KUMHO MITSUI CHEM 2012 E / P / C
2 MVR Introduction of MVR in Solvent Recovery Process (using 92℃ Waste gas, 2.9㎏/㎠G 6.3Ton/hr Steam Production) KUMHO POLY CHEM 2010 E / P / C
1 MVR Introduction of R-Line MVR System (using 102℃ Waste water, 6㎏/㎠G 12.9Ton/hr Steam Production) KUMHO PETRO CHEM 2009 E / P / C

LDAR

( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Item Project Client Year Scope
9 LDAR VCM LDAR System Monitoring work HANWHA PETRO CHEM 2006 E
8 LDAR VCM Production team LDAR system Monitoring work HANWHA PETRO CHEM 2005 E
7 LDAR LG Chem LDAR Supply contract SK C&C 2005 E
6 LDAR Hanwha Petro Chem LDAR Inventory & TAG Installation work SK C&C 2004 E
5 LDAR LDAR Inventory service for oil refining process 1 / MTBE process LG CALTEX 2002 E
4 LDAR LDAR Inventory work (Oil 2~5 Team, RFCC) LG CALTEX 2002 E
3 LDAR # 2 Aromatic Plant LDAR Inventory LG CALTEX 2001 E
2 LDAR No.1 Aromatic Plant Shipment Facility LDAR Inventory LG CALTEX 2001 E
1 LDAR Inventory work to introduce LDAR Program to No.1 Aromatics LG CALTEX 2000 E

VCU

( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Item Project Client Year Scope
4 VCU VRU New installation Project (1,200N㎥/hr) KUMHO POLY CHEM 2023 E / P / C
3 VCU VCU 2nd additional connection project (9,000N㎥/hr) S-OIL 2023 E / P / C
2 VCU VCU installation to reduce storage emission in #1/2 facilities area for legal compliance(9000N㎥/hr) S-OIL 2020 E / P / C
1 VCU VCU equip. manufacturing, installation & design (1,2 Terminal)(2500N㎥/hr, 3800N㎥/hr) KOREA VOPARK TERMINAL 2018 E / P / C

VRU

( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Item Project Client Year Scope
9 VRU VRU installation (removal of VOC using VRU after removal of storage tank RTO)(1466㎥/hr) LOTTE CHEM 2018 E / P / C
8 VRU VRU installation design(2 Terminal CI Gas process) KOREA VOPAK TERMINAL 2018 E
7 VRU Mokpo Oil Reservoir VRU Package (Water vapor treatment generated during logistics shipment(240㎥/hr) S-OIL 2017 E / P / C
6 VRU Incheon VRU Expansion design (480㎥/hr) GS CALTEX 2012 E
5 VRU Busan VRU Expansion design (480㎥/hr) GS CALTEX 2011 E
4 VRU GS Caltex Detail design for VRU Installation (8500m3/hr) H-PLUS ENG 2007 E
3 VRU GS Caltex Basic survey & detail design for offshore VRU plant installation (8500m3/hr) CLEAN AIR WORLD 2006 E
2 VRU GS-CALTEX Piping design review of Aromatic Day Tank Area VRU plant TECHWIN E&C 2006 E
1 VRU GS-CALTEX Piping design of Aromatic Day Tank Area VRU plant TECHWIN E&C 2005 E

RTO

( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Item Project Client Year Scope
11 RTO Factory 1 RTO-3(47,000N㎥/hr 2ea) new installation project KUMHO POLY CHEM 2023 E / P / C
10 RTO Factory 2 RTO(80,000N㎥/hr 2ea) new installation project KUMHO POLY CHEM 2023 E / P / C
9 RTO Factory 1,2 RTO(12000N㎥/hr, 23000N㎥/hr) installation project KUMHO P&B CHEM 2022 E / P / C
8 RTO Factory 1 RTO-2(38000N㎥/hr 2ea) new installation project KUMHO POLY CHEM 2021 E / P / C
7 RTO Factory 2 RTO(65000N㎥/hr 2ea) new Installation Project KUMHO POLY CHEM 2020 E / P / C
6 RTO KP Factory I RTO(35,000N㎥/hr 2ea) Installation Project KUMHO POLY CHEM 2020 E / P / C
5 RTO High heat resistance nylon A4 mass production process basic design FEED(Including new installation of RTO) LOTTE ADVANCED MATERIALS 2019 E
4 RTO Polymerization G-Line NB Latex parallel production facility construction EPC (Including new installation of RTO) KUMHO PETRO CHEM 2016 E / P / C
3 RTO Yeosu NCC 3 factory Piping design for additional installation of VOC related RTO EG GREEN TECH 2006 E
2 RTO LG Caltex OIL RTO design TECH WIN 2004 E
1 RTO Civil design related to SM plant RTO LG CHEM 2001 E

WASTE WATER TREATMENT SYSTEM

( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Item Project Client Year Scope
8 WWT Detailed design related to relocation of H-WWT1 wastewater treatment plant LOTTE CHEM 2023 E
7 WWT Kumho Mitsui Chem Wastewater treatment plant detail design & approval (Revamping) Q-BIO TECH 2018 E
6 WWT Wastewater treatment plant upgrading construction(steam stripping→Improved steam reduction by microbial treatment) KUMHO MITSUI CHEM 2013 E / P / C
5 WWT Honam Petro Chem no.2 plant wastewater treatment facility construction design H-PLUS ENG 2008 E
4 WWT ABS Wastewater treatment plant capa-up design LG CHEM 2001 E
3 WWT Wastewater treatment plant oil removal & treatment water discharge design LG CALTEX 2001 E
2 WWT Improved sulfuric acid injection system for the no.2 wastewater treatment plant LG CALTEX 2001 E
1 WWT Namhae Chem #3 DNT/MNT Civil/Piping design for wastewater treatment plant OSBL HANWHA 2000 E

CCS SYSTEM

( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Item Project Client Year Scope
6 CCS CCS Pilot Plant (1MW) OSBL Basic Engineering, FEED design service KEPCO E&C 2024 E
5 CCS BASIC DESIGN AND ESTIMATE FOR CONSTRUCTION OF CO₂ CAPTURE PILOT PLANT HANWHA TOTAL ENERGIES 2022 E
4 CCS FEED service for dry CO₂ capture process after combustion of 1 million tons KEPCO E&C 2021 E
3 CCS Detail design for 2,000MTPA high purity CO₂ refining & filling facility construction project WONIK MATERIALS 2020 E
2 CCS 150MW Enhancement of Carbon Capture Storage technology KEPCO 2017 E / P / C
1 CCS 10MW Carbon capture technology commercial package module development KEPCO 2015 E