번호 | Project | Client | Period | Scope |
---|---|---|---|---|
74 | NEW CONSTRUCTION OF 5 TANKS AT THE PETROCHEMICAL PIER AND CIVIL ENGINEERING NON-RESIDENT SUPERVISION FOR AUXILIARY FACILITIES | MARINE GLORY | 2021.01~2021.12 | CS |
73 | FIREFIGHTING SUPERVISION SERVICE FOR NEW OIL TANK CONSTRUCTION | GS CALTEX | 2019.04~2019.12 | FS |
72 | DAESAN PLANT 22.9KV FACILITY REPLACEMENT CONSTRUCTION SUPERVISION SERVICE | LG CHEM | 2019.02~2019.07 | CS |
71 | NCC POWER TEAM SUPERVISION OF #3,4 GTG STATOR | LG CHEM | 2018.10~2018.12 | CS |
70 | SUPERVISION OF ABS3 S-7, 8 AND EPS EMERGENCY GENERATOR REPLACEMENT | LG CHEM | 2018.07~2019.03 | CS |
69 | POE OSBL ELECTRICAL CONSTRUCTION SUPERVISION | LG CHEM | 2017.06~2017.11 | CS |
68 | SUPERVISION OF ELECTRICAL CONSTRUCTION FOR SOLAR POWER GENERATION FACILITIES AT NCC FACTORY | LG CHEM | 2015.11~2016.01 | CS |
67 | SUPERVISION OF REVAMPING OF TRANSFORMER AND POWER RECEPTION FACILITIES & NEW CONSTRUCTION OF NO.2 GTG | LG CHEM | 2014.07~2015.05 | CS |
66 | SSBR ELECTRICAL CONSTRUCTION SUPERVISION | LG CHEM | 2013.05~2013.10 | CS |
65 | EVA ELECTRICAL CONSTRUCTION SUPERVISION | LG CHEM | 2012.04~2013.11 | CS |
64 | BPA ELECTRICAL CONSTRUCTION SUPERVISION | LG CHEM | 2012.04~2013.01 | CS |
63 | HCC POLYSILICON PROJEC ELECTRICAL CONSTRUCTION SUPERVISION | HANWHA CHEM | 2011.08~2013.05 | CS |
62 | PVC SL PROJECT ELECTRICAL CONSTRUCTION SUPERVISION | LG CHEM | 2011.07~2011.10 | CS |
61 | OTK E-4 PROJECT ELECTRICAL CONSTRUCTION SUPERVISION | ODFJELL KOREA | 2011.06~2011.09 | CS |
60 | HPC P2(4PE) PROJECT ELECTRICAL CONSTRUCTION SUPERVISION | HONAM PETRO CHEM | 2011.04~2012.01 | CS |
59 | SUPERVISION OF ELECTRIC/INSTRUMENTATION WORK FOR 6 NEW TANKS | YTT | 2011.03~2011.04 | CS |
58 | N-2 PROJECT ELECTRICAL EQUIPMENT INSTALLATION SUPERVISION | LG CHEM | 2010.12~2011.05 | CS |
57 | SUPERVISION OF 154KV UNDERGROUND POWER LINE 2 INSTALLATION WORK | LG CHEM | 2010.05~2011.05 | CS |
56 | SUPERVISION OF ELECTRICAL CONSTRUCTION FOR INSTALLATION OF WASTE HEAT RECOVERY FACILITY IN SOLVENT RECOVERY PROCESS | KUMHO POLY CHEM | 2010.04~2010.08 | CS |
55 | SUPERVISION OF ELECTRICAL CONSTRUCTION FOR REPLACING OBSOLETE FACILITIES AT MMA PLANT 1 | LG MMA | 2010.03~2010.03 | CS |
54 | YNCC #3 ESR RELATED ELECTRICAL CONSTRUCTION SUPERVISION | YNCC | 2010.02~2010.06 | CS |
53 | ELECTRICAL CONSTRUCTION SUPERVISION RELATED TO ADL SAFETY FACILITIES | KUMHO MITSUI CHEM | 2010.02~2010.05 | CS |
52 | C01M START VOLTAGER DROP MITIGATION FACILITY INSTALLATION ELECTRICAL CONSTRUCTION SUPERVISION | AIR LIQUIDE KOREA | 2010.01~2010.03 | CS |
51 | SUPERVISION OF ELECTRICAL CONSTRUCTION FOR MVR SYSTEM FOR REPLACEMENT OF R-LINE HEAT PUMP | KUMHO PETRO CHEM | 2009.11~2010.01 | CS |
50 | #3 NCC ESR RELATED GENERATOR REPLACEMENT ELECTRICAL CONSTRUCTION SUPERVISION | YNCC | 2009.09~2009.11 | CS |
49 | ELECTRICAL CONSTRUCTION SUPERVISION FOR MDI-PH PURIFICATION PROJECT | KUMHO MITSUI CHEM | 2009.09~2009.10 | CS |
48 | SUPERVISION OF HPC B-PROJECT TEMPORARY POWER ELECTRICAL CONSTRUCTION | HONAM PETRO CHEM | 2009.08~2009.09 | CS |
47 | No.3 HOU HCR ELECTRICAL CONSTRUCTION SUPERVISION | GS CALTEX | 2009.06~2010.11 | CS |
46 | SUPERVISION OF ELECTRICAL EQUIPMENT INSTALLATION WORK FOR OXYGEN PLANT IN DONGBU STEEL | AIR LIQUIDE KOREA | 2009.03~2009.07 | CS |
45 | NO.3 HOU PROJECT CONSTRUCTION SUPERVISION | GS CALTEX | 2008.10~2010.07 | CS |