( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
사업 Reference
번호 Project Client Period Scope
179 3RD Hx REFINE PROCESS IMPROVEMENT PROJECT KOREA PETRO CHEM 2014.08~2015.12 E
178 DETAIL DESIGN FOR PE2, LP-2M-LLD PRODUCTION FACILITY HANWHA CHEM 2014.07~2014.09 E
177 CURRENTIZATION OF RELAY DRAWINGS YNCC 2014.07~2014.12 E
176 ELEC./INSTR./CIVIL DESIGN OF 2014 NCC(NAPHTHA CRACKING CENTER) UTILITY AREA EXPANSION PROJECT LG TOYO ENG 2014.07~2014.12 E
175 H-PC, EFFICIENCY IMPROVEMENT LOTTE CHEM 2014.07~2015.01 E / P / C
174 DETAIL DESIGN FOR SPP(SUPER ABSORBENT POLYMER PILOT) PROJECT WOOYANG HC 2014.06~2014.12 E
173 TPEE(THERMOPLASTIC EASTER ELASTOMER) PROJECT SAMYANG 2014.05~2015.12 E
172 DETAIL DESIGN FOR H2 BOOSTING COMPRESSOR INSTALLATION SPG CHEM 2014.04~2014.12 E
171 PGC(PROCESS GAS COMPRESSOR) DIFFERENTIAL PRESSURE IMPROVEMENT DESIGN LG CHEM 2014.04~2015.06 E
170 5AA PROJECT GS E&C 2014.04~2015.07 E
169 2014 MDI(METHYLENE DIPHENYL ISOCYANATE) PLANT ANNUAL SHUT-DOWN PROJECT KUMHO MITSUI CHEM 2014.02~2014.05 E / P / C
168 H-PC, T-130(MPC REACTION TOWER) MVR(MECHANICAL VAPOR RECOMPRESSING) INSTALLATION PROJECT LOTTE CHEM 2014.01~2015.09 E / P / C
167 2014 NCC EXPANSION PROJECT(PIPING DESIGN) GS E&C 2014.01~2015.09 E
166 #3 C3 PURIFICATION SYSTEM LG CHEM 2014.01~2015.05 E
165 ELEC./INSTR./CIVIL DESIGN OF 2014 NCC(NAPHTHA CRACKING CENTER) EXPANSION PROJECT LG TOYO ENG 2014.01~2014.12 E
164 PIPING DUCT & CHUTE DURING CONSTRUCTION OF EGKr HOT PHASE-2 PROJECT TOYO ENG 2014.01~2014.10 P / C
163 ELECTRICAL CONSULTANT SERVICE LG CHEM 2013.12~2015.06 E
162 DETAILED DESIGN OF PROCESS STEAM PIPE NETWORK SAMSUNG FINE CHEM 2013.12~2015.12 E
161 FALLING FILM EVAPORATOR SYSTEM CONSTRUCTION KUMHO MITSUI CHEM 2013.12~2014.05 E / P / C
160 CM2 PROJECT HANWHA CHEM 2013.09~2013.09 E
159 UNHYDROGENATED C5 SEPARATION FACILITY CONSTRUCTION PROJECT LOTTE CHEM 2013.09~2013.12 E / P / C
158 LOCAL SUPPLIES & WORKS FOR Y2 NG FEEDSTOCK CONVERSION PROJECT AIR LIQUIDE KOREA 2013.08~2014.05 E / P / C
157 9.9MW BACK-PRESSURE TURBINE INSTALLATION PROJECT HANWHA ENERGY 2013.08~2015.02 E
156 CA5/OXY5 MATERIAL TAKE OFF HANWHA CHEM 2013.08~2013.08 E
155 LIQUID EPOXY RESIN(II) 45,000MTPA REVAMPING PROJECT KUMHO P&B CHEM 2013.08~2014.07 E / P / C
154 NGL-3200 BEDP(BASIC ENGINEERING DOCUMENTS PACKAGE) ENDORSEMENT N.I.O.C (S.W.PG) 2013.07~2013.09 E
153 KUMHO POLY CHEM YEP-V(EPDM) 60,000MT/Y CONSTRUCTION PROJECT POSCO ENG 2013.07~2015.11 E
152 NH3 COLD HEAT RECOVERY PROJECT SAMSUNG FINE CHEM 2013.07~2013.10 E / P / C
151 RAW MATERIAL STORAGE TANK FARM PROJECT CHEIL INDUSTRIES 2013.06~2013.10 E
150 INCHEON INTERNATIONAL LOGISTICS WHARF HYUNDAI OIL BANK 2013.05~2016.03 E