( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
번호 | Project | Client | Period | Scope |
---|---|---|---|---|
89 | YP-1 EXPANSION PROJECT | GS E&C | 2010.08~2011.06 | E / PS |
88 | NEW LED CHEMICAL MATERIAL PLANT ESTABLISHED | LAKE LED | 2010.08~2010.11 | E / P / C |
87 | MYO DO SM G2-SECTION PIPE RACK TRANSFER | LG CHEM | 2010.07~2010.12 | E |
86 | TECHNICAL SELF-RELIANCE FOR 2ND PLANT | KUMHO POLY CHEM | 2010.07~2010.11 | E |
85 | ST EAM SUPPLY AND CONDENSATE RECOVERY PIPING INSTALLATION DESIGN | GS CALTEX | 2010.06~2010.11 | E / PS |
84 | NO.4 DNT PROJECT | GS E&C | 2010.06~2011.06 | E / PS |
83 | SOLVENT CASTING EQUIPMENT ROOM INTERIOR AND CONTROL CONSTRUCTION | SAMSUNG ELEC. | 2010.05~2010.06 | E / P / C |
82 | LHD REACTOR PILOT UNIT ESTABLISHMENT | DAELIM INDUSTRIAL | 2010.05~2010.07 | E / PS |
81 | 43KGG STEAM CHEIL INDUSTRIAL SUPPLY PIPE RACK | YCOGEN | 2010.04~2010.11 | E |
80 | PROPANE DRYING PACKAGE | DAELIM INDUSTRIAL | 2010.04~2010.11 | E / P / C |
79 | B-SECTION 400MB ULSD TANK 1EA | GS CALTEX | 2010.04~2011.05 | E / PS |
78 | DAESAN EO(ETHYLENE OXIDE) PLANT INCREASING PRODUCTIVITY PROJECT | SERVEONE | 2010.03~2011.05 | E / PS |
77 | TANK 6EA CONSTRUCTION | YTT | 2010.02~2010.09 | E / PS / CS |
76 | INTRODUCED WASTE HEAT RECOVERY FACILITY(MVR) OR SOLVENT RECOVERY PROCESS | KUMHO POLY CHEM | 2010.01~2010.08 | E / P / C |
75 | KP-Ⅱ PLANT DEBOTTLENECKING | KUMHO POLY CHEM | 2010.01~2010.05 | E / P / C |
74 | YEOSU PLANT CA PRODUCTION TEAM 2 SRS INSTALLATION WORK | HANWHA CHEM | 2009.12~2010.04 | E / P / C |
73 | GS CALTEX #3 HOU GN2 GAS LINE EXTENSION | DAESUNG GAS | 2009.02~2009.04 | E / PS / CS |
72 | ADL SAFETY FACILITY INSTALLATION OF EXISTING MDI SYNTHESIS PLANT | KUMHO MITSUI CHEM | 2009.07~2010.11 | E / P |
71 | HPC B-PROJECT | GS E&C | 2009.06~2010.10 | P / CS |
70 | DETAILED DESIGN SERVICE FOR YEOSUSANDAN AREA 3RD STAGE COMMON PIPE RACK INSTALLATION WORK | KICOX | 2009.04~2009.05 | E / GA |
69 | MDI-PH DESIGN/MATERIALS | KUMHO E&C | 2009.02~2010.01 | E / PS / CS |
68 | OSBL STEAM SUPPLY PIPE RACK | YCOGEN | 2009.01~2009.04 | E |
67 | INDUSTRIAL ESTATE COMMON PIPE RACK CONSTRUCTION | DAELIM INDUSTRIAL | 2008.12~2009.05 | E / PS / GA |
66 | LG CHEM FURNACE EXTENSION PROJECT | LG CHEM | 2008.11~2009.12 | E |
65 | MTBE(METHYL TERTIARY BUTYL ETHER) EXPANSION PROJECT | GS E&C | 2008.11~2009.11 | E / PS |
64 | LG CHEM M3 PROJECT | GS E&C | 2008.10~2010.06 | P / PS |
63 | SBS(STYRENE BUTADIENE STYRENE) 60,000TON BASIC PACKAGE | LG CHEM | 2008.10~2009.02 | E |
62 | STEAM SUPPLY BOILER ADDITIONAL INSTALLATION WORK | KUMHO POLY CHEM | 2008.07~2008.10 | E / P / C |
61 | DBS #1 PROJECT | AIR LIQUIDE KOREA | 2008.07~2009.09 | E / PS |
60 | KP STEP II PLANT UNDERGROUND PIPE REPLACEMENT | KUMHO PETRO CHEM | 2008.04~2008.05 | E |