( E : Engineering / P : Procument / PS : Procument Service / C : Construction / CS : Construction Supervision / GA : Government Approval )
번호 | Project | Client | Period | Scope |
---|---|---|---|---|
596 | PMMA3 45KTPA EXPANSION – LOW-CONCENTRATION WASTEWATER TREATMENT FACILITY CAPA-UP PROJECT | LX MMA | 2025.07~2026.07 | E / P / C |
595 | KAMIX W3 PROJECT - BASIC DESIGN AND TIC ESTIMATION | UMICORE KOREA BATTERY MATERIALS | 2025.06~2026.10 | E |
594 | ROUTE STUDY AND BASIC DESIGN SERVICES FOR POWER DISTRIBUTION LINE | HANWHA ENERGY | 2025.06~2025.12 | E |
593 | DETAILED ENGINEERING DESIGN FOR PROPYLENE OFF-SITE PIPING | GS CALTEX | 2025.06~2025.08 | E |
592 | IMPROVEMENT PROJECT FOR RURAL VILLAGE SEWERAGE SYSTEM IN BOODONG DISTRICT, IMJA | SHINAN-GUN | 2025.05~2028.06 | P / C |
591 | NAKDONGGANG W2 PROJECT | UMICORE KOREA BATTERY MATERIALS | 2025.05~2026.07 | E / P / C |
590 | YP-3 EXPANSION PROJECT (PMMA NO.3 45KTPA)) | LX MMA | 2025.05~2026.07 | E / P / C |
589 | ROUTE STUDY AND BASIC DESIGN FOR YEOSU ECO ENERGY TRANSMISSION LINE | YEOSU ECO ENERGY | 2025.05~2025.08 | E |
588 | #1 PX WASTE HEAT RECOVERY PROJECT | S-OIL | 2025.04~2026.08 | E / P / C |
587 | ONSAN MTBE PROJECT – VRU PACKAGE FOR VAPOR RECOVERY SYSTEM | LX MMA | 2025.04~2026.02 | E / P / C |
586 | 3-YEAR BP ITEM PRE-ENGINEERING & COST ESTIMATION SERVICE (2025) | S-OIL | 2025.04~2025.07 | E |
585 | FEASIBILITY STUDY (F/S) FOR INDONESIA SUSTAINABLE AVIATION FUEL (SAF) DEVELOPMENT PROJECT | LOTTE E&C CONSORTIUM | 2025.03~2025.10 | E |
584 | DESIGN SERVICE FOR JWA TDS-L TRAIN#2 EXPANSION | JAEWON INDUSTRIAL | 2025.03~2026.03 | E |
583 | 2025 CAPITAL INVESTMENT EPC WORK | KUMHO MITSUI CHEM | 2025.03~2025.12 | E / P / C |
582 | EHS IMPROVEMENT WORK FOR MDI PLANT AT PLANT 2 | KUMHO MITSUI CHEM | 2025.03~2025.12 | E / P / C |
581 | PROCESS IMPROVEMENT WORK FOR MDI PLANT AT PLANT 1 | KUMHO MITSUI CHEM | 2025.03~2025.12 | E / P / C |
580 | PROCESS IMPROVEMENT WORK FOR MDI PLANT AT PLANT 2 | KUMHO MITSUI CHEM | 2025.03~2025.12 | E / P / C |
579 | COST REDUCTION WORK FOR MDI PLANT AT PLANT 2 | KUMHO MITSUI CHEM | 2025.03~2025.12 | E / P / C |
578 | METHANOL DISTILLATION COLUMN IMPROVEMENT WORK | KUMHO MITSUI CHEM | 2025.03~2025.12 | E / P / C |
577 | KAMIX W3 BASIC ENGINEERING | UMICORE KOREA BATTERY MATERIALS | 2025.03~2025.05 | E |
576 | DETAILED ENGINEERING FOR YANGCHEONG N2O C-TRAIN EXPANSION | WONIK MATERIALS | 2025.03~2025.10 | E |
575 | ELECTRICAL & INSTRUMENTATION REDUNDANCY INVESTMENT WORK FOR NaCl CONCENTRATION AND PURIFICATION PROCESS IN PLANT 1 & 2 | KUMHO MITSUI CHEM | 2025.02~2025.03 | E / P / C |
574 | IMPROVEMENT WORK FOR STABILIZATION OF 200KTPA MDI EXPANSION PLANT | KUMHO MITSUI CHEM | 2025.02~2025.09 | E / P / C |
573 | EPC WORK FOR REPLACEMENT OF MECHANICAL EQUIPMENT INCLUDING WASTEWATER NEUTRALIZATION TANK | KUMHO MITSUI CHEM | 2024.12~2025.07 | E / P / C |
572 | DETAILED DESIGN FOR NBL PLANT ABS FEED TANK TRANSFER INVESTMENT | LG CHEM | 2024.12~2025.12 | E |
571 | SSBR 35KTPA EXPANSION PROJECT | KUMHO PETRO CHEM | 2024.12~2026.03 | E / P / C |
570 | INSTALLATION WORK FOR M-DA105 COLUMN AND MDA SEAL CIRCULATION SYSTEM | KUMHO MITSUI CHEM | 2024.12~2025.08 | E / P / C |
569 | EXECUTION WORK INCLUDING FORMAL PIPE INSTALLATION FOR PI LINE | KUMHO MITSUI CHEM | 2024.12~2025.02 | E / P / C |
568 | 7,000NM3/HR VCU INSTALLATION PROJECT FINAL STEP | S-OIL | 2024.12~2026.03 | E / P / C |
567 | FEASIBILITY STUDY SERVICE FOR OSBL PIPING AND STEEL STRUCTURES | DIG AIR GAS | 2024.11~2025.02 | E |